Industrial machinery development runs on physical parts: a frame that has to be bolted to a floor, a guard that has to survive an interlock test, a manifold that has to hold pressure, a wear part that has to outlast a maintenance interval. SkillsProto builds those parts in one plant in Shenzhen — CNC machining at ±0.005 mm on critical features, sheet metal frames, guards and panels, injection molding, vacuum casting from 10 to 500, die casting from 500 pieces, and FRP covers — with MOQ 1 and 3-7 working day CNC lead times.
The parts that come through most often
| Part type | Process | Material | Typical quantity |
|---|---|---|---|
| Machine frame plates and risers | CNC or sheet metal | Mild steel, 6061, 304 | 1-20 |
| Safety guards and interlock housings | Sheet metal or CNC | 5052 sheet, polycarbonate | 1-50 |
| Hydraulic and pneumatic manifolds | CNC | 6061, 304 stainless | 1-20 |
| Mounting brackets and motor plates | CNC | 6061, mild steel | 1-50 |
| Wear strips, guides and rollers | CNC | POM, PA, UHMW-PE, tool steel | 1-100 |
| Operator panels and HMI enclosures | Sheet metal + CNC | Steel, aluminium, ABS | 1-50 |
| Covers, cowls and machine skins | Vacuum casting or FRP | PU, ABS, glass fibre | 10-500 |
| Low-volume replacement and spare parts | CNC, vacuum casting, die casting | Per the original part | 1-500 |
Frames: welded assembly or machined plate
The first cost decision on any frame is whether it is a welded sheet metal assembly or a machined plate. The rule of thumb:
- Machined plate wins when flatness, hole position accuracy or a sealing face matter, when quantity is under about 20, and when the geometry is compact. No fixture, no distortion, ±0.005 mm available on datums.
- Welded and folded sheet metal wins when the frame is large, when it is mostly about enclosing volume, and when quantity goes above roughly 20. Cheaper per unit in volume, but it needs a fixture and it will move during welding, so critical faces are usually machined after welding.
The hybrid that usually costs least: folded and welded structure for the volume, with machined pads and mounting faces added where accuracy is actually needed. Say which faces are functional and we will quote that version rather than a fully machined block.
Manifolds: ports, sealing and pressure
Manifold work is where a prototype shop either has the discipline or does not. What matters:
- Port thread and sealing form — specify the standard (BSPP, BSPT, NPT, SAE, ISO 6149 or your own), because the seal is in the form, not the thread. We do not guess ports from a model.
- Bore intersections — internal cross-drillings create burrs at the intersection that a model will never show. Deburring internal intersections is a real operation and we quote it as one.
- Flatness on the mounting face and positional tolerance on the port pattern are the two callouts worth spending tolerance budget on.
- Pressure test — if the manifold will be tested, say at what pressure and to what standard at quote stage, so the part is built and documented to it.
Wear parts and material substitution
Wear components are the easiest place to save money on a machine, and the easiest place to lose it. POM and UHMW-PE are cheap, quiet and self-lubricating for guides and low-load wear strips; PA (nylon) absorbs moisture and grows, which matters in a tight slot; tool steel or hardened 4140 is right for high-load or abrasive contact; bronze and oil-filled bronze remain the classic bearing bushing choice. If a part is failing in service rather than in design, send the failed part — wear pattern, discoloration and fracture surface tell us more than the drawing does.
Spare parts and legacy replacement
A significant share of industrial work is replacement: a machine is twenty years old, the OEM is gone, and one bracket has cracked. We work from the sample part, a hand sketch, or a scan, and quote reverse engineering as a separate line item so you can see what it costs before committing. For quantities above about 500, die casting or a production tool usually beats machining on unit price; below that, machining or vacuum casting wins because there is no tooling to amortise.
Guards and safety hardware
Guards are judged on interlock fit, rigidity and visibility, in that order. Polycarbonate needs generous radii at cut-outs and holes because it cracks at stress concentrations — sharp internal corners in a polycarbonate guard are a failure waiting for a service call. Sheet metal guards need a defined earthing point and a finish that survives the cleaning regime. Safety-related components should be validated against the applicable machinery standard by your own compliance process; we build to the drawing and do not certify safety functions.
Cost drivers on industrial parts
Machining time follows material removal, so the single biggest lever is how much stock has to come out: a bracket profiled from plate is cheaper than one cut from solid bar. Second is the setup count, because every re-fixturing adds alignment risk and handling time. Third is surface finish specification — a general Ra callout across every face costs far more than a functional finish on the sealing or bearing faces alone. If a part will be painted, the cosmetic standard only has to hold under the coating, and we will quote to that rather than to a bare-metal finish nobody will see.
Frequently Asked Questions
How fast can you deliver a machined industrial part?
CNC parts ship in 3-7 working days, with a 48-hour expedite available. Sheet metal assemblies take 5-10 days, vacuum cast batches 10-15 days, and die casting from 500 pieces depends on tooling. DDP transit to the UK, EU or US adds 3-5 days.
Can you reverse engineer a broken part?
Yes. Send the sample, a sketch or a scan and we will quote reverse engineering as a separate line before any machining is committed. A worn or cracked sample is genuinely useful — the failure pattern tells us what to change in the replacement.
What tolerances do you hold on mounting faces?
±0.005 mm on critical CNC features, ±0.05 mm on general dimensions, ISO 2768-m where the drawing is silent. For frames the useful callouts are flatness on the mounting face and positional tolerance on the bolt pattern; leave the outer profile general.
Do you supply welded assemblies?
Yes. Sheet metal frames, welded structures and machined-after-weld faces are quoted in house. We do not supply welding procedure qualification or certified weld inspection — if your machine requires certified welding documentation, arrange that through your own compliance route.
What is the minimum order quantity?
MOQ is 1 piece on machined, printed and sheet metal parts. Vacuum casting covers 10-500 pieces, and die casting starts at 500 pieces where tooling amortises.
Can you ship a mixed spare parts kit?
Yes. A kit of machined brackets, sheet metal panels and moulded or cast covers is quoted as one BOM, built in one plant and shipped as one DDP consignment, which is usually cheaper than three suppliers and three freight bills.
Related capabilities
Related guides
Have parts to quote?
Upload your files — DFM-checked quotation within 24 hours.