Automotive programmes rarely need one kind of prototype. A concept review needs a part that looks right, a rig test needs a part that carries load, and a pre-production build needs twenty of them that fit the car the same way every time. SkillsProto builds all three from one plant in Shajing, Bao'an, Shenzhen: CNC machining at ±0.005 mm on critical features, 3-7 working day lead times, MOQ 1, vacuum casting from 10 to 500 pieces without tooling, sheet metal, FRP and composites, injection molding and die casting. Engineering drawings are reviewed by the engineer who will release the job, and written DFM notes come back with the quote inside 24 business hours.
Match the process to the stage, not to the habit
The most expensive mistake in prototype work is machining a part that only needed to look right, or moulding a part that still has three revisions to go. The table below is the mapping we use when quoting automotive work.
| Programme stage | What the part has to prove | Process we quote first | Typical quantity | Lead time |
|---|---|---|---|---|
| Concept / design review | Shape, ergonomics, packaging | 3D printing (SLA, SLS, MJF) or CNC in ABS / aluminium | 1-5 | 2-4 days printed, 3-7 days machined |
| Appearance model | Surface, paint, grain, gloss | CNC + hand finishing, or FRP / carbon fibre skin | 1-3 | 5-10 days |
| Functional test | Load, heat, vibration, fit under torque | CNC in 6061, 7075 or 304 stainless | 1-20 | 3-7 days, 48 h expedite |
| Assembly validation | Fit across a full sub-assembly | CNC + sheet metal + vacuum casting combined | 5-50 | 7-15 days |
| Pre-production / low volume | Repeatable parts, real material | Vacuum casting, aluminium tooling, or die casting | 10-500+ | Vacuum casting 10-15 days, aluminium tool 7-10 days, die casting from 500 |
| Structural composite part | Stiffness at low mass | FRP / carbon fibre layup | 1-50 | 7-15 days |
Materials that carry the decision
6061-T6 aluminium is the default for brackets, manifolds and test fixtures: it machines cleanly, welds, anodises and holds ±0.005 mm without fighting the tool. 7075-T6 is the choice when the part is load-critical and weight-sensitive — suspension links, uprights, motorsport brackets — at the cost of weldability and a little corrosion resistance. 304 stainless appears where heat, corrosion or hygiene is in the specification: exhaust-adjacent hardware, fluid fittings, brackets near a hot side.
For interior and trim work, ABS and PC machine and print well and take paint; PA12 (SLS / MJF) survives under-bonnet temperatures better than SLA resin; polypropylene-like vacuum cast resins cover 10-500 interior parts before tooling exists. Body panels, ducts, intakes and aerodynamic addenda are where FRP and carbon fibre earn their place: a stiff, light skin off a machined or printed pattern, typically 7-15 days for the first article.
Tolerances: where to spend them and where not to
A prototype budget is mostly tolerance budget. Call ±0.005 mm on the datum features that locate the part — bore centres, mounting faces, seal grooves — and let the rest sit at ISO 2768-m or ±0.05 mm. Every tight callout beyond the datums buys a setup, a slower finish pass or a CMM report, and none of it changes what the test will tell you.
Two habits that cut cost without weakening the result: design so that all critical features can be reached in one or two setups, and avoid deep pockets with small corner radii that force a tiny, slow tool. Wall thickness under about 0.8 mm in aluminium will chatter; the fix is a thicker wall or a rib, not a slower feed rate.
Motorsport and low-volume tuning work
Shorter programmes are where a prototype shop with its own machines earns the job. A bracket, a pedal set, a steering column adapter or a sensor mount is a 1-20 piece job that cannot wait for tooling. CNC covers it in 3-7 days, and if the part goes into production at 10-500 units, vacuum casting or an aluminium tool covers the run without the 15-25 day wait and cost of hardened steel tooling. For simulator hardware, cockpit structures and sim-racing peripherals the same logic applies: small batches, mixed materials, tight fit to off-the-shelf components.
Inspection and packing before it leaves
Automotive parts are usually measured before they are fitted, so the report matters as much as the part. Every order ships with a first article inspection report showing measured values against the drawing, and CMM data is available for the datum features you call out. Machined faces are deburred and edges broken as standard; if a part will be welded or bonded on arrival, say so and we will leave the relevant faces machined and free of coating. Parts are packed individually with protection on finished and sealing surfaces, and shipped DDP with 3-5 day transit to the UK and EU, so customs and duties are already handled when the box arrives.
What to send us
A STEP or DWG file, a PDF drawing, quantity, material, finish, and a note on which features actually carry the function. If there is an interface — a bearing bore, a mating flange, a sensor thread — say so; that is what we will hold tight and measure. DFM notes come back with the price inside 24 business hours, and the first article ships with an FAI report.
Frequently Asked Questions
How fast can you deliver an automotive prototype part?
CNC parts ship in 3-7 working days, with a 48-hour expedite for urgent single parts. 3D printed parts are 2-4 days. Vacuum cast batches of 10-500 pieces take 10-15 days, aluminium tooling 7-10 days to first shot, and die casting starts at 500 pieces. DDP transit to the UK and EU adds 3-5 days.
Can you make parts that look like production parts?
Yes, to the extent the drawing specifies. CNC with hand finishing, vapour polishing or paint gives a production-like appearance on 1-5 parts; vacuum casting reproduces production texture and colour over 10-500 parts better than any machined prototype will. What we do not do is guess at a finish you have not specified — send the gloss level, grain or RAL code.
Do you hold IATF 16949 or supply production parts to OEMs?
No. SkillsProto is a prototype and low-volume manufacturer and makes no automotive quality-system certification claims. If your programme requires a certified supplier for series production, engage one; for prototype, test and low-volume builds we quote on capability and lead time.
What is the minimum order?
MOQ is 1 piece on machined and printed parts. Vacuum casting covers 10-500 pieces without a tool, and die casting starts at 500 pieces where the tooling cost amortises.
Can you combine processes in one order?
Yes, and for automotive assemblies it is usually cheaper. A bracket set that needs machined aluminium, a bent sheet metal tray and ten moulded covers is quoted as one BOM, built in one plant and shipped as one DDP consignment with a single landed cost.
What tolerances do you hold on mounting features?
±0.005 mm on critical CNC features and ±0.05 mm on general dimensions, with ISO 2768-m as the default where the drawing is silent. Every order ships with an FAI report and CMM data is available on request for the features that matter.