Verification is where you prove the design and the process before committing to production tooling. We produce verification builds on the intended process, measure them against the drawing, document the results and flag anything that needs attention before the money is spent.
Dateien hochladen — Angebot in 24 Std. DFM-Prüfung anfordern
Verification builds on intended production process
Dimensional reports against ballooned drawings
Material and process certificates for the batch
Functional, leak and life testing coordination
CPK studies on critical dimensions
Documented corrective action loop before release
| Spezifikation | Details |
|---|---|
| Sample stages | T1, T2 and pre-production |
| Inspection | CMM with full report |
| Documentation | FAI, dimensional report, material certs |
| Capability | CPK studies on request |
| Timeline | 5–15 working days per sample stage |
| Sign-off | Written release before mass production |
T1 is the first article from a new tool, used to identify tool corrections. T2 follows those corrections and is normally the sample used for customer approval and pilot builds.
Yes. Where a customer requires full production-intent samples we cut the production tool first and sample from it, which lengthens the schedule but removes the risk of the pilot-to-production gap.
We issue a non-conformance report with the measured deviation, propose the tool change and re-sample after correction, all documented against the drawing revision.
Design for manufacturing review and engineering support: DFM analysis, material selection, tolerance optimisation and cost reduction before tooling.
Production packaging, kitting and labelling: retail cartons, foam inserts, barcode labelling and drop-tested transport packaging.
Mass production ramp and repeat supply: moulding, casting and machining at volume with process control, scheduled deliveries and stock holding.