Verification is where you prove the design and the process before committing to production tooling. We produce verification builds on the intended process, measure them against the drawing, document the results and flag anything that needs attention before the money is spent.

Déposer des fichiers — Devis en 24 h  Demander une analyse DFM

Capacités

Ce que nous faisons

✓

Verification builds on intended production process

Verification builds on intended production process

✓

Dimensional reports against ballooned drawings

Dimensional reports against ballooned drawings

✓

Material and process certificates

Material and process certificates for the batch

✓

Functional, leak and life testing coordination

Functional, leak and life testing coordination

✓

CPK studies on critical dimensions

CPK studies on critical dimensions

✓

Documented corrective action loop before release

Documented corrective action loop before release

Spécifications

Spécifications clés

SpécificationDétails
Sample stagesT1, T2 and pre-production
InspectionCMM with full report
DocumentationFAI, dimensional report, material certs
CapabilityCPK studies on request
Timeline5–15 working days per sample stage
Sign-offWritten release before mass production
FAQ

Questions fréquentes

What is the difference between T1 and T2 samples?

T1 is the first article from a new tool, used to identify tool corrections. T2 follows those corrections and is normally the sample used for customer approval and pilot builds.

Can you supply samples with production tooling steel?

Yes. Where a customer requires full production-intent samples we cut the production tool first and sample from it, which lengthens the schedule but removes the risk of the pilot-to-production gap.

What happens if dimensions are out of tolerance?

We issue a non-conformance report with the measured deviation, propose the tool change and re-sample after correction, all documented against the drawing revision.