Heat Treatment

Heat treatment changes the internal structure of metal to achieve hardness, toughness or stability. It is also essential for relieving the stress that machining and welding introduce, which otherwise causes parts to move after the final cut.

Subir archivos — Presupuesto en 24 h  Solicitar revisión DFM

Capacidades

Qué hacemos

✓

Hardening and tempering of tool and carbon steels

Hardening and tempering of tool and carbon steels

✓

Stress relief before and after machining

Stress relief before and after machining

✓

Annealing and normalising

Annealing and normalising

✓

Case hardening and nitriding

Case hardening and nitriding

✓

Hardness verified on every batch

Hardness verified on every batch

✓

Distortion controlled on thin and long parts

Distortion controlled on thin and long parts

Materiales

Materiales

Tool steel O1, D2, A2
Carbon steel 1045 and 4140
Stainless steels
Alloy steels for nitriding
Aluminium for T6 ageing
Especificaciones

Especificaciones clave

EspecificaciónDetalles
ProcessesHardening, tempering, annealing, nitriding
Hardnessup to 62 HRC depending on material
FurnaceControlled atmosphere up to 1,100 °C
VerificationHardness testing per batch
StandardsDocumented time and temperature cycles
Lead time4–8 working days
Acabados

Acabados superficiales y postprocesado

Stress relieved before final machining

Stress relieved before final machining

Tempered after hardening

Tempered after hardening

Oxide scale removed afterwards

Oxide scale removed afterwards

FAQ

Preguntas frecuentes

Why stress relieve before finish machining?

Machining leaves residual stress that pulls the part out of tolerance when material is removed. Relieving stress between roughing and finishing keeps the final dimensions stable.

What hardness can you achieve?

Tool steels reach 58 to 62 HRC after hardening and tempering, while case hardening produces a hard surface with a tough core for impact resistance.

How do you control distortion?

By using controlled heating and cooling rates, supporting long parts during the cycle and, where necessary, leaving grinding stock that we remove afterwards.

¿Listo para empezar su proyecto de {service}?

Envíe sus archivos hoy — presupuesto con DFM en 24 horas.

Solicitar presupuesto