Welding Services

Welding turns cut and formed parts into a single structural assembly. We match the process to the material and the cosmetic requirement: TIG for clean stainless and visible joints, MIG for thicker steel frames, spot and projection welding for sheet assemblies, and laser welding where heat distortion must stay minimal.

ファイルをアップロード — 24時間で見積もり  DFMレビューを依頼

能力

対応内容

✓

TIG welding

TIG welding for stainless, aluminium and thin sheet

✓

MIG welding

MIG welding for mild steel frames and thicker sections

✓

Spot, projection and seam welding

Spot, projection and seam welding for sheet assemblies

✓

Laser welding

Laser welding for minimal distortion and fine joints

✓

Leak testing and dye penetrant on sealed enclosures

Leak testing and dye penetrant on sealed enclosures

✓

Weld dressing and cosmetic finishing

Weld dressing and cosmetic finishing for exposed surfaces

材料

材料

Mild steel and high-strength steel
Stainless 304, 316 and duplex
Aluminium 5052, 5083 and 6061
Galvanised steel with fume control
Copper and brass
Titanium on request
仕様

主要仕様

項目詳細
MaterialsSteel, stainless, aluminium, copper, brass
Thickness0.5–20 mm
TIG qualityWeld class to ISO 5817 B or C
Leak testPressure decay and bubble testing
DistortionFixtured welding and stress relief
Lead time4–7 working days
仕上げ

表面処理・後加工

Pickling and passivation of stainless

Pickling and passivation of stainless

Weld grinding and blending

Weld grinding and blending

Powder coating and painting

Powder coating and painting

Zinc plating of welded steel frames

Zinc plating of welded steel frames

FAQ

よくあるご質問

How do you stop thin sheet from distorting?

By welding in fixtures, using the lowest heat input that achieves penetration, balancing the weld sequence around the part and where necessary clamping against a chill bar to draw heat away.

Can you certify welds?

We can provide weld procedure specifications and welder qualification records, plus visual, dye penetrant and pressure testing. Third-party NDT can be arranged on request.

Do you weld assemblies with inserts already fitted?

Yes, although we generally weld first and install PEM hardware afterwards to avoid heat damage to the fasteners. The sequence is stated in the process plan.

{service}プロジェクトを始める準備はできましたか?

本日ファイルをお送りください — 24時間以内にDFM確認済み見積もりをお届けします。

即時見積もりを取得