Mass Production

Once the process is verified, production becomes a discipline of consistency. We hold the process window, inspect to a defined sampling plan, schedule deliveries against your build plan and hold buffer stock so a late change upstream does not stop your line.

上传图纸 —— 24 小时内报价  申请 DFM 评估

加工能力

我们做什么

✓

Production moulding, casting, machining and assembly

Production moulding, casting, machining and assembly

✓

Defined process windows with recorded parameters

Defined process windows with recorded parameters

✓

Sampling inspection to AQL or your standard

Sampling inspection to AQL or your standard

✓

Scheduled deliveries and consignment stock

Scheduled deliveries and consignment stock

✓

Buffer and safety stock held in Shenzhen

Buffer and safety stock held in Shenzhen

✓

Continuous improvement on cycle time and yield

Continuous improvement on cycle time and yield

技术规格

关键规格

项目参数
Volumes1,000–500,000 parts per year
Process controlRecorded parameters per production lot
InspectionAQL sampling or 100 % on critical features
LogisticsWeekly or monthly scheduled shipments
StockBuffer stock and consignment options
ReportingMonthly quality and delivery performance
常见问题

常见问题解答

How do you prevent quality drift over a long production run?

By recording process parameters for every lot, keeping tooling on a preventive maintenance schedule and tracking inspection results over time so a trend is visible before it becomes a non-conformance.

Can you hold stock for us?

Yes. Many customers use buffer stock in Shenzhen to shorten lead time to a few days while production batches run on a longer cycle.

What happens when demand changes?

We flex moulding machine allocation and shift patterns up or down within a defined band, and we agree in advance how quickly we can ramp so your planning is realistic.

准备开始您的{service}项目了吗?

今天就发送图纸 —— 24 小时内获得经 DFM 审核的报价。

立即获取报价