For 10โ100 parts, vacuum (urethane) casting is typically 60โ80% cheaper than injection molding and delivers finished parts in 5โ10 days โ injection molding only becomes the economical choice above roughly 500 units, once aluminum tooling (7โ10 days) or production steel tooling (4โ6 weeks) is amortized across the run.

Cost ladder: casting vs molding by quantity
The two processes price completely differently. Casting carries a small silicone-tool cost that you pay once and a per-part resin price that barely falls; molding carries a real tooling investment that only pays back as the run grows. That is why the cheapest process flips as quantity increases:
| Quantity | Vacuum casting | Injection molding | Usually cheaper |
|---|---|---|---|
| 10 parts | No meaningful tool cost; parts in 5โ10 days | Tool cost dominates; weeks of payback per part | Casting, by a wide margin |
| 50 parts | Per-part cost falls; still no heavy tooling | Aluminum tool (7โ10 days) begins to make sense | Casting |
| 100 parts | Still the sweet spot for cast urethane | Tooling amortization still heavy | Casting, usually |
| 500+ parts | Multiple silicone molds needed (20โ30 casts each) | Tool cost now spread thin; per-part price drops sharply | Molding |
Switching checklist: when to move to injection molding
Casting is not a lesser molding โ it is the right tool for a different job. Move to molding when any of these is true:
- Annual demand passes roughly 500 parts, or lifetime demand exceeds ~5,000 pieces of the same design.
- The part needs certified production material data โ cast PU resins mimic ABS, PC and PA but are not the certified engineering resin.
- A stable aluminum bridge tool (7โ10 days) or production steel tool (4โ6 weeks) fits the program timeline.
- Wall thickness, rib depth or undercuts need the consistency of a rigid tool across thousands of shots.
- Stay with casting when the design is still moving, the quantity is 10โ100, or you need painted, printed or soft-touch finishes on parts that look and feel molded โ at a fraction of the tooling exposure.
Material fidelity: how close is cast urethane to the real resin?
- PU resins are formulated to mimic ABS, PC and PA grades in feel, Shore hardness and flexural behaviour; glass-filled and transparent variants are available, and overmolded soft-touch grips are routine.
- Dimensional accuracy is about ยฑ0.2 mm on cast parts โ plenty for housings, covers and fit-checks, not enough for precision mating features (those should be machined or molded).
- One silicone mold yields roughly 20โ30 casts before detail degrades, which is exactly why casting suits short runs and molding suits volume.
- Injection molding runs the final engineering resin with drawing-level tolerances (typically ยฑ0.1 mm general), so it is the only route when material certification or tight tolerances are contractual.
A practical middle path many teams miss: cast 50โ100 bridge parts now while the aluminum tool is cut in parallel โ you get sales samples and test units in 5โ10 days without waiting for the mold, then switch to molded supply mid-programme. Send your STEP file and the 24-hour DFM review will price both routes side by side.
Frequently Asked Questions
Is vacuum casting cheaper than injection molding?
Below roughly 100 units, yes โ silicone tooling costs a fraction of an aluminum or steel mold, so casting wins on total cost. Above about 500 units, the mold is amortized and molding is usually cheaper per part.
How many parts can one silicone mold produce?
Typically 20โ30 casts per mold before surface detail degrades, which is exactly why casting suits short runs and injection molding suits volume.
When should I switch from vacuum casting to injection molding?
When annual volume passes ~500 parts, lifetime demand exceeds ~5,000 parts, or you need certified production materials. An aluminum bridge tool covers the gap in 7โ10 days.
How close are vacuum-cast parts to molded parts?
Visually and mechanically very close โ PU resins mimic ABS, PC and PA grades and dimensions hold about ยฑ0.2 mm. But they are prototype or bridge parts, not certified production material.
Related capabilities
Related guides
Have parts to quote?
Upload your files โ DFM-checked quotation within 24 hours.